johnsimsprojects.com Johnsimsprojects.com

   
Wong138: Daftar Situs Slot Online Terpercaya Dan Slot Gacor Hari Ini

Domain Summary

What is the traffic rank for Johnsimsprojects.com?

• Johnsimsprojects.com ranks #7,521,610 globally on HypeStat.

What IP addresses does Johnsimsprojects.com resolve to?

• Johnsimsprojects.com resolves to the IP addresses 2606:4700:3034::6815:3076, 172.67.151.14.

Where are Johnsimsprojects.com servers located in?

• Johnsimsprojects.com has servers located in United States.

johnsimsprojects.com Profile

Title:Wong138: Daftar Situs Slot Online Terpercaya Dan Slot Gacor Hari Ini Description:Wong138 adalah platform situs judi online resmi dan terpercaya indonesia yang menyediakan daftar slot gacor hari ini mudah menang dengan pelayanan profesional.
Tags:

What technologies does johnsimsprojects.com use?

These are the technologies used at johnsimsprojects.com. johnsimsprojects.com has a total of 8 technologies installed in 7 different categories.

johnsimsprojects.com Traffic Analysis

Johnsimsprojects.com is ranked #7,521,610 in the world.
Daily Visitors n/a
Monthly Visits n/a
Pages per Visit n/a
Visit duration n/a
Bounce Rate n/a
Is this your site?Verify your site's metrics.
Daily Unique Visitors:
 n/a
Monthly Visits:
n/a
Pages per Visit:
n/a
Daily Pageviews:
n/a
Avg. visit duration:
n/a
Bounce rate:
n/a
Global Reach:
 n/a
HypeRank:
7,521,610
*All traffic values are estimates only.

Total Visits Last 3 Months

0
DEC
0
JAN
0
FEB
Last update was 466 days ago
     
This can take up to 60 seconds. Please wait...

*HypeStat.com is not promoting or affiliated with johnsimsprojects.com in any way. Only publicly available statistics data are displayed.

Search Engine Indexes

Search engine indexes are huge databases or collections of net pages that search engines like google like google and yahoo use to retrieve applicable facts while customers carry out searches. These indexes are created through search engines like google and yahoo through crawling and indexing net pages from throughout the internet.
Google Index:
67

 

SEMrush is a complete on line advertising and marketing platform that gives a extensive variety of gear and functions to help companies and entrepreneurs in enhancing their on line visibility and optimizing their virtual advertising and marketing strategies.
SemRushSemRush
Domain:
  johnsimsprojects.com
Rank:
(Rank based on keywords, cost and organic traffic)
  n/a
Organic Keywords:
(Number of keywords in top 20 Google SERP)
  0
Organic Traffic:
(Number of visitors coming from top 20 search results)
  0
Organic Cost:
((How much need to spend if get same number of visitors from Google Adwords)
  $0.00

Ad Experience Report

Summary of the ad experience rating of a website for a specific platform.

Mobile summary

Root domain:
johnsimsprojects.com
Ad filtering:
(Chrome is not filtering ads on your site.)
Off
Status:
(The status of the site that is reviewed for the Better Ads Standards.)
Not reviewed

Desktop summary

Root domain:
johnsimsprojects.com
Ad filtering:
(Chrome is not filtering ads on your site.)
Off
Status:
(The status of the site that is reviewed for the Better Ads Standards.)
Not reviewed

Abusive Experience Report

Summary of the abusive experience rating of a website.
Root domain:
johnsimsprojects.com
Enforcement:
(Chrome is not preventing your site from opening new windows or tabs.)
Off
Status:
(The status of the site reviewed for the abusive experiences.)
Not reviewed

Where is johnsimsprojects.com hosted?

Johnsimsprojects.com may be hosted in multiple data centers distributed in different locations around the world. This is probably just one of them.

How fast does johnsimsprojects.com load?

The average loading time of johnsimsprojects.com is 814 ms. The Desktop speed index is 0 and mobile speed index is 69.
Average Load Time:
814 ms

Page Speed (Google PageSpeed Insights) - Mobile

69
0-49 50-89 90-100 i

Field Data

Over the last 30 days, the field data shows that this page has a speed compared to other pages in the Chrome User Experience Report.We are showing the 90th percentile of FCP and the 95th percentile of FID.

Cumulative Layout Shift (CLS)0 0% of loads for this page have a fast (<0s) Cumulative Layout Shift (CLS) 0% 0% of loads for this page have an average (0s ~ 0s) Cumulative Layout Shift (CLS) 0% 0% of loads for this page have a slow (>0s) Cumulative Layout Shift (CLS) 0%
Time To First Byte (TTFB)0 0% of loads for this page have a fast (<0s) Time To First Byte (TTFB) 0% 0% of loads for this page have an average (0s ~ 0s) Time To First Byte (TTFB) 0% 0% of loads for this page have a slow (>0s) Time To First Byte (TTFB) 0%
First Contentful Paint (FCP)0 0% of loads for this page have a fast (<0s) First Contentful Paint (FCP) 0% 0% of loads for this page have an average (0s ~ 0s) First Contentful Paint (FCP) 0% 0% of loads for this page have a slow (>0s) First Contentful Paint (FCP) 0%
First Input Delay (FID)0 0% of loads for this page have a fast (<0ms) First Input Delay (FID) 0% 0% of loads for this page have an average (0ms ~ 0ms) First Input Delay (FID) 0% 0% of loads for this page have a slow (>0ms) First Input Delay (FID) 0%
Interactive To Next Paint (INP)0 0% of loads for this page have a fast (<0s) Interactive To Next Paint (INP) 0% 0% of loads for this page have an average (0s ~ 0s) Interactive To Next Paint (INP) 0% 0% of loads for this page have a slow (>0s) Interactive To Next Paint (INP) 0%
Largest Contentful Paint (LCP)0 0% of loads for this page have a fast (<0s) Largest Contentful Paint (LCP) 0% 0% of loads for this page have an average (0s ~ 0s) Largest Contentful Paint (LCP) 0% 0% of loads for this page have a slow (>0s) Largest Contentful Paint (LCP) 0%

Origin Data

All pages served from this origin have an speed compared to other pages in the Chrome User Experience Report. over the last 30 days.To view suggestions tailored to each page, analyze individual page URLs.

Cumulative Layout Shift (CLS)0 0% of loads for this page have a fast (<0s) Cumulative Layout Shift (CLS) 0% 0% of loads for this page have an average (0s ~ 0s) Cumulative Layout Shift (CLS) 0% 0% of loads for this page have a slow (>0s) Cumulative Layout Shift (CLS) 0%
Time To First Byte (TTFB)0 0% of loads for this page have a fast (<0s) Time To First Byte (TTFB) 0% 0% of loads for this page have an average (0s ~ 0s) Time To First Byte (TTFB) 0% 0% of loads for this page have a slow (>0s) Time To First Byte (TTFB) 0%
First Contentful Paint (FCP)0 0% of loads for this page have a fast (<0s) First Contentful Paint (FCP) 0% 0% of loads for this page have an average (0s ~ 0s) First Contentful Paint (FCP) 0% 0% of loads for this page have a slow (>0s) First Contentful Paint (FCP) 0%
First Input Delay (FID)0 0% of loads for this page have a fast (<0ms) First Input Delay (FID) 0% 0% of loads for this page have an average 0ms ~ 0ms) First Input Delay (FID) 0% 0% of loads for this page have a slow (>0ms) First Input Delay (FID) 0%
Interactive To Next Paint (INP)0 0% of loads for this page have a fast (<0s) Interactive To Next Paint (INP) 0% 0% of loads for this page have an average (0s ~ 0s) Interactive To Next Paint (INP) 0% 0% of loads for this page have a slow (>0s) Interactive To Next Paint (INP) 0%
Largest Contentful Paint (LCP)0 0% of loads for this page have a fast (<0s)Largest Contentful Paint (LCP) 0% 0% of loads for this page have an average (0s ~ 0s)Largest Contentful Paint (LCP) 0% 0% of loads for this page have a slow (>0s)Largest Contentful Paint (LCP) 0%

Lab Data

Total Blocking Time 90 ms
Sum of all time periods between FCP and Time to Interactive, when task length exceeded 50ms, expressed in milliseconds. Learn more about the Total Blocking Time metric
Lazy load third-party resources with facades  
Some third-party embeds can be lazy loaded. Consider replacing them with a facade until they are required. Learn how to defer third-parties with a facade
Time to Interactive 5.1 s
Time to Interactive is the amount of time it takes for the page to become fully interactive. Learn more about the Time to Interactive metric
First Contentful Paint 2.2 s
First Contentful Paint marks the time at which the first text or image is painted. Learn more about the First Contentful Paint metric
Largest Contentful Paint 4.9 s
Largest Contentful Paint marks the time at which the largest text or image is painted. Learn more about the Largest Contentful Paint metric
Speed Index 5.4 s
Speed Index shows how quickly the contents of a page are visibly populated. Learn more about the Speed Index metric
First Meaningful Paint 2.3 s
First Meaningful Paint measures when the primary content of a page is visible. Learn more about the First Meaningful Paint metric
Timing budget  
Set a timing budget to help you keep an eye on the performance of your site. Performant sites load fast and respond to user input events quickly. Learn more about performance budgets
Performance budget  
Keep the quantity and size of network requests under the targets set by the provided performance budget. Learn more about performance budgets

Does johnsimsprojects.com use compression?

Website compression is the process of reducing the size of website files, such as HTML, CSS, JavaScript, and image files, to improve website performance and load times. Compressing website files can significantly reduce the amount of data that needs to be transferred from the server to the user's browser, resulting in faster page load times and improved user experience. Files on johnsimsprojects.com are reduced by 91%.
johnsimsprojects.com use br compression.
Original size: 216.98 KB
Compressed size: 18.81 KB
File reduced by: 198.17 KB (91%)

Google Safe Browsing

Google Safe Browsing is a service provided by Google that helps protect users from visiting websites that may contain malicious or harmful content, such as malware, phishing attempts, or deceptive software.
This site is not currently listed as suspicious

MyWot.com Reputation Ratings

MyWOT (short for "My Web of Trust") is a web-based reputation and rating service that provides users with information about the trustworthiness and safety of websites. johnsimsprojects.com has 61 Safety Reputations.
Status:
  SAFE
Safety Reputations:
  61
Safety Confidence:
  3

SSL Checker - SSL Certificate Verify

An SSL (Secure Sockets Layer) certificate is a digital certificate that establishes a secure encrypted connection between a web server and a user's web browser. It provides authentication and encryption, ensuring that data transmitted between the server and the browser remains private and protected. johnsimsprojects.com supports HTTPS.
 johnsimsprojects.com supports HTTPS
     
Verifying SSL Support. Please wait...
Common Name: generationrescue.org
Organization:
Location:
Issuer: GTS CA 1P5
Valid from: Mar 27 18:05:28 2024 GMT
Valid until: Jun 25 18:05:27 2024 GMT
Authority: CA:FALSE
Keysize: 2048 Bits
Common Name: GTS CA 1P5
Organization: Google Trust Services LLC
Location: US
Issuer: GTS Root R1
Valid from: Aug 13 00:00:42 2020 GMT
Valid until: Sep 30 00:00:42 2027 GMT
Authority: CA:TRUE
Keysize: 2048 Bits
Common Name: GTS Root R1
Organization: Google Trust Services LLC
Location: US
Issuer: GlobalSign Root CA
Valid from: Jun 19 00:00:42 2020 GMT
Valid until: Jan 28 00:00:42 2028 GMT
Authority: CA:TRUE
Keysize: 4096 Bits

Verify HTTP/2 Support

HTTP/2 (Hypertext Transfer Protocol version 2) is a major revision of the HTTP protocol, which is the foundation of data communication on the World Wide Web. It was developed as an improvement over the previous HTTP/1.1 version to enhance web performance and efficiency.
 johnsimsprojects.com supports HTTP/2
     
Verifying HTTP/2.0 Support. Please wait...

Http Header

HTTP headers are extra portions of records despatched among a consumer (which include an internet browser) and a server at some stage in an HTTP request or response. They offer instructions, metadata, or manipulate parameters for the conversation among the consumer and server.
date: Sun, 07 Apr 2024 12:12:54 GMT
location: https://www.generationrescue.org/
cache-control: max-age=3600
expires: Sun, 07 Apr 2024 13:12:54 GMT
report-to: {"endpoints":[{"url":"https://a.nel.cloudflare.com/report/v4?s=hhU5o%2Fujej3yFnSLdm3cY0azXd8nuB0P7W4JvN4JX6VedWCvj%2FSgAdIeivBzTxjwvRaXYdHNh3XME3nWxw83Ofxu8Olsc1%2FZtfOnrGWJNpww6SLEad%2FP5iwyUm45wpAmQuCbKW8f5g%3D%3D"}],"group":"cf-nel","max_age":604800}
nel: {"success_fraction":0,"report_to":"cf-nel","max_age":604800}
vary: Accept-Encoding
strict-transport-security: max-age=15552001; includeSubDomains
x-content-type-options: nosniff
server: cloudflare
cf-ray: 8709edb74a2729d8-ORD
alt-svc: h3=":443"; ma=86400

HTTP/2 200 
date: Sun, 07 Apr 2024 12:12:54 GMT
content-type: text/html; charset=utf-8
set-cookie: AWSALBTG=/e5AI8gpTyVa2gQ/K9JbQIp4X8SchKxsYx4coZ/Uil+YOQb+d7rbT/AtuPM2iOR/zjO0SqxBrgN4fGPdCE9PgM4ZTJytuqjaTPbFQbZjNLvuHo/2Hp+h+Isn4WX9EHHfBg76fdfJ5GIPtsGXkW7sbrtNY47E/X5Fkh+6nd+mX63+csOrk/M=; Expires=Sun, 14 Apr 2024 12:12:54 GMT; Path=/
set-cookie: AWSALBTGCORS=/e5AI8gpTyVa2gQ/K9JbQIp4X8SchKxsYx4coZ/Uil+YOQb+d7rbT/AtuPM2iOR/zjO0SqxBrgN4fGPdCE9PgM4ZTJytuqjaTPbFQbZjNLvuHo/2Hp+h+Isn4WX9EHHfBg76fdfJ5GIPtsGXkW7sbrtNY47E/X5Fkh+6nd+mX63+csOrk/M=; Expires=Sun, 14 Apr 2024 12:12:54 GMT; Path=/; SameSite=None
set-cookie: AWSALB=sO7UYDrPJisDaLJfsa4enc6Vs8OG+yGxu8waN2ctvm+skEKOmEtR8C5iQFfcnPeqjzjNvEZdNSNJDPUrLIGxQpyur9eyC7/RZtQyi4cJGzOOFzynczmCRcdfdwmy; Expires=Sun, 14 Apr 2024 12:12:54 GMT; Path=/
set-cookie: AWSALBCORS=sO7UYDrPJisDaLJfsa4enc6Vs8OG+yGxu8waN2ctvm+skEKOmEtR8C5iQFfcnPeqjzjNvEZdNSNJDPUrLIGxQpyur9eyC7/RZtQyi4cJGzOOFzynczmCRcdfdwmy; Expires=Sun, 14 Apr 2024 12:12:54 GMT; Path=/; SameSite=None
set-cookie: ASP.NET_SessionId=bwd52n3eshrcgdpdpym5ckvb; path=/; HttpOnly; SameSite=Lax
set-cookie: ASP.NET_SessionId=bwd52n3eshrcgdpdpym5ckvb; path=/; HttpOnly; SameSite=Lax
set-cookie: popup-home-page=true; expires=Sun, 07-Apr-2024 20:12:54 GMT; path=/
set-cookie: __RequestVerificationToken=TTDAHXDrya8ACMKFcBbmx4iNwMQ2YkR0UJy0EwXLwmbJzxQa_GfGcUL2aHslCjLbO0lpAipO7vIhmjITfFHBkW3xxDA3dxOfSELZGBZHt9M1; path=/; HttpOnly
cache-control: private, s-maxage=0
vary: Accept-Encoding
x-frame-options: SAMEORIGIN
x-content-type-options: nosniff
x-xss-protection: 1; mode=block
cf-cache-status: DYNAMIC
report-to: {"endpoints":[{"url":"https://a.nel.cloudflare.com/report/v4?s=3jVv9W54GEfO4Q5VcBCUBEzQ1leswFAXecY2okOYLUoAUNwCJkeNI7SW8ZDrIFogjTNG6%2Bs7OpwTSZz4VTE8ltSvgIaxjEK64zE4oH43y8phfLUkR0RCAge%2FPFKHxOcsbrmyaXvgjbFEJ%2Fs%3D"}],"group":"cf-nel","max_age":604800}
nel: {"success_fraction":0,"report_to":"cf-nel","max_age":604800}
strict-transport-security: max-age=15552001; includeSubDomains
server: cloudflare
cf-ray: 8709edb7ea4d115e-ORD
content-encoding: br
alt-svc: h3=":443"; ma=86400

DNS Lookup

DNS entries (Domain Name System) are a critical component of the Internet infrastructure. They act as directories that translate human-readable domain names (such as example.com) to machine-readable IP addresses. DNS records are stored on DNS servers and help forward internet traffic efficiently.
Type Ip Target/Txt TTL
HINFO 3600
AAAA 2606:4700:3031::ac43:970e 196
AAAA 2606:4700:3034::6815:3076 196
A 172.67.151.14 196
A 104.21.48.118 196
NS laylah.ns.cloudflare.com 172696
NS reese.ns.cloudflare.com 172696

Whois Lookup

Domain WHOIS is a public database that provides information about domain names, including registered owners, contact information, domain registrars, registration and expiration dates, name servers, and other relevant information. Domain registration for this website began on August 22, 2002 and will expire on August 22, 2025 if not renewed. This website is now assigned through the registrar GoDaddy.com, LLC. The WHOIS data for this website's domain was last updated on December 30, 2023.
Domain Created:
2002-08-22
Domain Expires:
2025-08-22
Domain Updated:
2023-12-30
Domain Age:
22 years 10 months 27 days
Domain Registrar:
GoDaddy.com, LLC
Domain Owner:
Domains By Proxy, LLC
WhoIs:
 

Domain Name: johnsimsprojects.com
Registry Domain ID: 89584094_DOMAIN_COM-VRSN
Registrar WHOIS Server: whois.godaddy.com
Registrar URL: https://www.godaddy.com
Updated Date: 2023-12-30T15:18:12Z
Creation Date: 2002-08-22T14:20:34Z
Registrar Registration Expiration Date: 2025-08-22T14:20:34Z
Registrar: GoDaddy.com, LLC
Registrar IANA ID: 146
Registrar Abuse Contact Email: email
Registrar Abuse Contact Phone: +1.4806242505
Domain Status: clientTransferProhibited https://icann.org/epp#clientTransferProhibited
Domain Status: clientUpdateProhibited https://icann.org/epp#clientUpdateProhibited
Domain Status: clientRenewProhibited https://icann.org/epp#clientRenewProhibited
Domain Status: clientDeleteProhibited https://icann.org/epp#clientDeleteProhibited
Registry Registrant ID: Not Available From Registry
Registrant Name: Registration Private
Registrant Organization: Domains By Proxy, LLC
Registrant Street: DomainsByProxy.com
Registrant Street: 2155 E Warner Rd
Registrant City: Tempe
Registrant State/Province: Arizona
Registrant Postal Code: 85284
Registrant Country: US
Registrant Phone: +1.4806242599
Registrant Phone Ext:
Registrant Fax: 
Registrant Fax Ext:
Registrant Email: Select Contact Domain Holder link at https://www.godaddy.com/whois/results.aspx?domain=johnsimsprojects.com
Registry Admin ID: Not Available From Registry
Admin Name: Registration Private
Admin Organization: Domains By Proxy, LLC
Admin Street: DomainsByProxy.com
Admin Street: 2155 E Warner Rd
Admin City: Tempe
Admin State/Province: Arizona
Admin Postal Code: 85284
Admin Country: US
Admin Phone: +1.4806242599
Admin Phone Ext:
Admin Fax: 
Admin Fax Ext:
Admin Email: Select Contact Domain Holder link at https://www.godaddy.com/whois/results.aspx?domain=johnsimsprojects.com
Registry Tech ID: Not Available From Registry
Tech Name: Registration Private
Tech Organization: Domains By Proxy, LLC
Tech Street: DomainsByProxy.com
Tech Street: 2155 E Warner Rd
Tech City: Tempe
Tech State/Province: Arizona
Tech Postal Code: 85284
Tech Country: US
Tech Phone: +1.4806242599
Tech Phone Ext:
Tech Fax: 
Tech Fax Ext:
Tech Email: Select Contact Domain Holder link at https://www.godaddy.com/whois/results.aspx?domain=johnsimsprojects.com
Name Server: LAYLAH.NS.CLOUDFLARE.COM
Name Server: REESE.NS.CLOUDFLARE.COM
DNSSEC: unsigned
URL of the ICANN WHOIS Data Problem Reporting System: http://wdprs.internic.net/
>>> Last update of WHOIS database: 2024-04-07T12:14:37Z